This ACH Storage and Dosing Facility Upgrade came about to improve the safety and reliability of ACH dosing to the plant.

The works delivered were comprised of:

    • Detailed design and documentation.
    • ACH dosing system including unloading bay, storage tank, dosing equipment, and ancillary works.
    • Supply and installation of raw water monitoring (i.e. Turbidity and pH) instrumentation
    • Potable water booster pump and pipework to increase water pressure, a hose down point, and a hose reel.
    • Electrical installation of all new equipment.
    • Integration of all new equipment into the existing plant PLC and SCADA.
    • Testing and commissioning
    • As-constructed documentation (drawings, updated asset data register, and updating relevant sections of the existing tertiary filter O&M manuals).

Value: $549K

 